<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Surface Production Facility &#187; Ideas To Enhance Gas Flow</title>
	<atom:link href="http://www.process-facility.com/category/gas-production-facility/gas-processing-troubleshooting/ideas-to-enhance-gas-flow.html/feed" rel="self" type="application/rss+xml" />
	<link>http://www.process-facility.com</link>
	<description>Oil and Gas Production Facility Design</description>
	<lastBuildDate>Fri, 14 May 2010 03:34:57 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=abc</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Enhancing Gas Flow &#8211; The Birth and Dead of Gas Well</title>
		<link>http://www.process-facility.com/enhancing-gas-flow-the-birth-and-dead-of-gas-well.html</link>
		<comments>http://www.process-facility.com/enhancing-gas-flow-the-birth-and-dead-of-gas-well.html#comments</comments>
		<pubDate>Fri, 09 Oct 2009 22:13:47 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Ideas To Enhance Gas Flow]]></category>
		<category><![CDATA[Enhancing Gas Flow]]></category>

		<guid isPermaLink="false">http://www.process-facility.com/?p=2356</guid>
		<description><![CDATA[




When a well is completed, it must be cleared of sand before it&#8217;s production can be lined up to the collection laterals. This is accomplished by &#8220;flowing-back&#8221;, or &#8220;flaring&#8221;, the well. For a typical gas well, this requires venting the tubing to the atmosphere for 3 or 4 days at a typical rate of 5 [...]]]></description>
		<wfw:commentRss>http://www.process-facility.com/enhancing-gas-flow-the-birth-and-dead-of-gas-well.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Enhancing Gas Flow &#8211; Jet Enjectors</title>
		<link>http://www.process-facility.com/enhancing-gas-flow-jet-enjectors.html</link>
		<comments>http://www.process-facility.com/enhancing-gas-flow-jet-enjectors.html#comments</comments>
		<pubDate>Sun, 04 Oct 2009 14:37:57 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Ideas To Enhance Gas Flow]]></category>
		<category><![CDATA[Jet Injectors]]></category>

		<guid isPermaLink="false">http://www.process-facility.com/?p=2281</guid>
		<description><![CDATA[




Figure 2—2 shows how high pressure gas from the tubing side of dual completion can be employed to compress the low pressure casing gas. An ejector, an apparatus in common use in process plants, acts as a compressor without moving parts. The installed cost of the apparatus pictured in figure 2-2, is less than $10,000, [...]]]></description>
		<wfw:commentRss>http://www.process-facility.com/enhancing-gas-flow-jet-enjectors.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Enhancing Gas Flow &#8211; Dual Completion Wells</title>
		<link>http://www.process-facility.com/enhancing-gas-flow-dual-completion-wells.html</link>
		<comments>http://www.process-facility.com/enhancing-gas-flow-dual-completion-wells.html#comments</comments>
		<pubDate>Sun, 04 Oct 2009 13:51:58 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Ideas To Enhance Gas Flow]]></category>
		<category><![CDATA[Dual Completion Wells]]></category>

		<guid isPermaLink="false">http://www.process-facility.com/?p=2277</guid>
		<description><![CDATA[




By perforating the casing both below and above the packer, as shown in figure 2-1, a lease operator can produce natural gas from two different zones simultaneously. Thus, a dual completion can double the intiial gas flow from a well. If, as often happens, the formation being drained by the tubing is depleted first, a [...]]]></description>
		<wfw:commentRss>http://www.process-facility.com/enhancing-gas-flow-dual-completion-wells.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Enhancing Gas Flow &#8211; Coning Water Into Well</title>
		<link>http://www.process-facility.com/enhancing-gas-flow-coning-water-into-well.html</link>
		<comments>http://www.process-facility.com/enhancing-gas-flow-coning-water-into-well.html#comments</comments>
		<pubDate>Sun, 04 Oct 2009 13:48:12 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Ideas To Enhance Gas Flow]]></category>
		<category><![CDATA[Coning Water Into Well]]></category>

		<guid isPermaLink="false">http://www.process-facility.com/?p=2273</guid>
		<description><![CDATA[&#8220;Mendoza, this meter is broken&#8221;, I complained. &#8220;Every time we increase the compressors speed to pull-down the wellhead pressure, the recorded gas flow drops. I just raised the rpm from 375 to 425,
and the wellhead pressure fell from 220 PSIG to 15 PSIG. But the metered flow decreased from 180 MSCFD to 150 MSCFD. That&#8217;s [...]]]></description>
		<wfw:commentRss>http://www.process-facility.com/enhancing-gas-flow-coning-water-into-well.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ideas To Enhance Gas Flow</title>
		<link>http://www.process-facility.com/ideas-to-enhance-gas-flow.html</link>
		<comments>http://www.process-facility.com/ideas-to-enhance-gas-flow.html#comments</comments>
		<pubDate>Sun, 04 Oct 2009 12:46:12 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Ideas To Enhance Gas Flow]]></category>
		<category><![CDATA[GAS FLOW]]></category>

		<guid isPermaLink="false">http://www.process-facility.com/?p=2269</guid>
		<description><![CDATA[One of the more puzzling phenomenon I have observed in gas field production happened during my tenure as an operator of wellhead compressors. One would intuitively assume that the faster the wellhead compressor ran, the more gas would be delivered through the sales meter. Normally, as the compressor speed was increased by manually screwing open [...]]]></description>
		<wfw:commentRss>http://www.process-facility.com/ideas-to-enhance-gas-flow.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
